Friday, April 15, 2016

Prep Work for Water Main Installation to Begin

Work Completed Last Week, April 11th to April 15th
·         Resident Preconstruction Meeting conducted on Thursday, April 14th.
·         Construction lay-out of improvements
·         Internal televising of existing storm and sanitary sewer systems.

Work Anticipated to be completed Next week, April 18th to 22nd
·         Layout of existing right-of-way limits
·         Exploratory excavation of existing utilities
·         Begin water main installation via directional drilling methods
·         Begin storm sewer installation